Australia/New Zealand Standard AS/NZS 1554 Steel Frame Lateral Support Rod

Australia Standard All of products to Australia can meet below standard.AS 4100-1998 Australian Standard Steel structuresAS/NZS 1554 Structural steel weldingAS/NZS 3678 Structural steel-Hot-rolled plates, floorplates and slabsAS/NZS 3679 Structural steelAS/NZS 3679.2  Part 2: Welded I sectionsAS/NZS ISO 9001 Quality managem

Featured Products

Australia Standard
All of products to Australia can meet below standard.


AS 4100-1998 Australian Standard Steel structures
AS/NZS 1554 Structural steel welding
AS/NZS 3678 Structural steel-Hot-rolled plates, floorplates and slabs
AS/NZS 3679 Structural steel
AS/NZS 3679.2  Part 2: Welded I sections
AS/NZS ISO 9001 Quality management and quality assurance standards
AS/NZS 4680.2006 Hot-dip galvanized (zinc) coatings on fabricated ferrous articles
NZS 3404 Steel structures Standard




1) Quality requirements for raw materials
Australia /New Zealand Standard AS/NZS 1554 Steel Framing Lateral Bracing Bar

Australia /New Zealand Standard AS/NZS 1554 Steel Framing Lateral Bracing Bar


2) Quality requirements for Tolerance
Australia /New Zealand Standard AS/NZS 1554 Steel Framing Lateral Bracing Bar

Australia /New Zealand Standard AS/NZS 1554 Steel Framing Lateral Bracing Bar

3) Quality requirements
for Hot-dip galvanized


Australia /New Zealand Standard AS/NZS 1554 Steel Framing Lateral Bracing Bar



Australia /New Zealand Standard AS/NZS 1554 Steel Framing Lateral Bracing Bar

Australia /New Zealand Standard AS/NZS 1554 Steel Framing Lateral Bracing Bar
Advantage
1.Cost saving and transportation convenient, custom design available
2.The main beam and column are made of quality steel
3.Steel structure makes the house resist heavy wind of 220km/h and 8-grade earthquake
4.Easy assembly and disassembly several times without damage
5.Good environmental protection effect. Steel structure housing construction greatly reduces sand,
stone and dosage of the ash. Most of the used materials are recyclable or degradable, little rubbish produced

6.Production according welding rules a = 0.7(1.0) x thickness of web;
7.Continuous welding on both sides of each pieces;
8.Own the hot dip galvanize zinc pool ourself,pool size:12.5x1.6x2m(LXWXD);
9.Mark every beam on the bottom plate for being saw after being galvanized;
10.Send pictures to the buyer by mail during products being processed and loaded in container;
11.Near the Qingdao port,only need 1.5hour by car,the land transport cost cheaper;
12.Near the Qingdao International port, only need 0.5hour by car, the client can visit us easily.

Australia /New Zealand Standard AS/NZS 1554 Steel Framing Lateral Bracing Bar
  
Projects name : Steel fabrication workshop layout/steel structure shed 
Item NameMaterials CharacteristicsMaterial GradeSurface Treatment
Steel ColumnH shape,Box,Steel Pipe,Hot tolled sheetQ235B,Q345BPaint or Hot dip Galvanized
Steel beamH shape,Box,Steel Pipe,Hot tolled sheetQ235B,Q345BPaint or Hot dip Galvanized
Steel BracingSteel Rod,Steel Pipe,Angle SteelQ235B,Q345BPaint or Hot dip Galvanized
Steel PurlinC or Z purlins(Thickness1.8mm~3.0mm)Q235B,Q345BHot dip Galvanized
External Wall panels,Roof panelsSingle colorful corrugate steel sheet,sandwich panels with EPS,Rock wool,PU.Galvanized Steel+PaintingAlu-zin 150g,Fluorocarbon pain
Steel buildings DoorSlidding or Rolling doorSteel or Aluminum sheetPaint or Hot dip galvanized
Steel buildings WindowsAluminum alloy-Glass,Aluminum alloy-shutterT=1.0-2.0mmAlloy
Skylighting panelsFRP T=1.5mm-1.8mmCoefficient of thermal expansion:2.2x10-5/cmLight Tranmitar 85%
VentilatorTurbine ventilator on a ridgeSteel,Stainless steel ,PCPaint or Hot dip Galvanized
GutterGalvanized steel plate,Stainless steel plateT=2.0mmHot dip galvanized
DownpipePVC pipe,color steelpipe Y=0.5mmDia110mmpaint
Hight BoltOrdinary ,High strength10.9S,4.8SHot dip galvanized,Steel
Ground boltsSteel RodM24,M27,M30,M33,M39,M4210.9SSteel
Australia /New Zealand Standard AS/NZS 1554 Steel Framing Lateral Bracing Bar
1. You are manufacture factory or trading company?
We are manufacture factory build in 2002. And you are welcomed to visit us at any time.
The quality control flow and sales team will show you our professionalism.
Also you will can get best and most competitive price after visiting us. 

2. Is your price competitive compared with other companies?
Our business objectives are to give the best price with same quality and best quality with the same price.
We will do everything we can to reduce your cost and guarantee you get the best product that you paid for. 

3. Can you send engineers or whole team to install my project?
We will give detailed installation drawings and video for free.
We can send engineers as installation director or a team upon request.

4. Do you accept container loading inspection?
You are welcomed to send an inspector, not only for the container loading,
but any time during the production time.

5. Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements.
By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc.
we can design complex industrial building like office mansion, super marker,
auto dealer shop, shipping mall, 5 star hotel.

6. What is the delivery time?
Delivery time depends on order quantities. In general the delivery time
to nearest seaport in China will be 30 days after receiving deposit.
 

7. How can you get a quotation for your projects?
You can contact us by email, phone, Alibaba TM, WhatsApp, Skype,
Viber and so on 24*7 and you will get reply within 8 hours.


Australia /New Zealand Standard AS/NZS 1554 Steel Framing Lateral Bracing Bar

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours